After a capacitor bank is de-energized, there will be residual charges in the units. Therefore, wait at least 5 minbefore approaching it to allow sufficient time for the internal discharge resistors in each capacitor unit to dis. One of the failure modes of capacitor units is bulging. Excessively bulged units indicate excessive internal pressure caused by overheating and generation of gases due to probable arcing c. Another mode of failure in the capacitor bank is leaking due to the failure of the cans. When handling the leaking fluid, avoid contact with the skin and take measures to prev. When returning to service, verify that all ground connections that were installed for maintenance purpose are removed. Allow a minimum of 5 min between de-energization of the capacitor b. During the initial inspection before energization of the capacitor banks the following measures should be taken: Measure #1– Verify proper mechanical assembly of the c.